    I often get asked questions: how to build a house for 1 million rubles?; Is it possible to build a house for 800 thousand rubles?; How to build a house for 500 thousand rubles? In this article I will tell you the secrets of how to build an inexpensive but high-quality house.

    Secrets of an inexpensive home

    The secrets of an inexpensive, but high-quality house are a whole complex of design and planning solutions, which we will consider in order, but first, it is necessary to determine a number of requirements that the house must meet. Our house must meet a number of requirements:

    1. The house must be durable

    2. The house must be warm

    3. The house must be made of environmentally friendly materials

    4. The house should be beautiful

    5. The house must be durable

    Layout of an inexpensive house

    Let's start with the layout of our house. There is such a thing as the ratio of the perimeter to the area of ​​the room, and we should definitely touch on this point. This value shows how much the length of the walls increases from the area of ​​the room. To make it more clear, let's look at an example:

    Using the example, we see that with an equal wall perimeter, the room area in the second option is 75 m2 less. This means that the cost of the first option is much lower, because the cost of constructing the foundation, plinth and external walls is the same in both options, and the area is 25 m2 larger.

    Conclusion: It is most profitable to build houses with a smaller wall perimeter in relation to the area of ​​the room. The smallest perimeter is on a square house. In order to improve the architectural solution, various forms of house planning are used, such as bay windows and other elements, but they all lead to higher prices. In our case, the house must be inexpensive, but it must also be beautiful, and we will achieve this requirement using other techniques.

    Constructive solutions for an inexpensive house

    Foundation

    The foundation is the foundation and you shouldn’t skimp on it. In order to reduce the cost of foundations, bored foundations are often used. The pillars are drilled, filled with concrete and a monolithic grillage is placed above the ground. This option has many fans, but I personally don't support it. I believe that it is much safer to put the house on a strip foundation. Let's look at an example:

    The main factor when calculating the foundation is the area of ​​support on the ground, and as we see in the figure, a strip foundation has a much larger area of ​​support. In a bored foundation, it is necessary to perform a soil analysis, and if the soil in one place has a lower density, then there is a danger of one of the pillars subsiding. A strip foundation is much more reliable in this regard. In case of slight subsidence, the foundation settles entirely and no subsidence cracks are visible on the walls.

    Base.

    The base can be made of red foundation brick and crushed stone block 390x190x190. This option is the most successful. Red brick is convenient for leveling; it also serves as a water seal for the main walls. The main volume is made from a block. This option will be cheaper and will meet our requirements.

    Walls.

    I plan to write a separate article about walls with a detailed development of all possible options, while calculating each option and considering all the advantages and disadvantages. Stay tuned. In this article, I propose to consider two wall options.

    1. Expanded clay concrete block M-75 size 390x190x190 - wall thickness 190 mm.

    2. Use a gas silicate block produced in Stary Oskol - wall thickness 300 mm.

    Each option has its advantages and disadvantages. For example, if wall cladding is not planned immediately, then it is better to use option 2. It will be possible to live in such a house without insulation for the first time, it will be warm enough and there will be no fungus on the walls. The first option requires insulation; it will not be possible to live in such a house without insulation. The first version of the wall is cheaper and, with proper insulation, quite warm. It is necessary to insulate 50 mm in two layers with seams spaced apart. As insulation, it is better to use basalt-based insulation with a density of at least 50.

    Floors.

    Floor coverings depend on the version of your house. If you have chosen an attic house, it is better to use reinforced concrete floor slabs. If we are building a house on the 1st floor, then it is more rational to use wood and create a ceiling in the form of trusses together with the roof.

    Roof.

    Due to the high foreign exchange rate, prices for roofing materials have increased significantly. If we are considering an economy class house, then we should use slate. The material is good, durable, not noisy.

    Example of an inexpensive house

    After a brief analysis of the main positions, I propose to consider a specific example of an inexpensive house and calculate the cost of each section. As an example, I propose to consider the project of a 1-storey building with a total area of ​​80 m2 developed by our company. The house has three living rooms, a living room of 18 m2 and two bedrooms of 16 and 15 m2, a kitchen of 13 m2 and a large shared bathroom that can freely accommodate: a bathtub, a washbasin, a toilet, a washing machine, and a laundry basket. To cut off cold air, a vestibule is required. It’s not worth building a house with a smaller area; you won’t be able to reduce the cost by much, but at the same time you will lose the whole idea of ​​a private house.

    Foundation cost

    In this project, the foundation is made of strips around the perimeter, as well as under one load-bearing wall (the floor is made of wood and it is desirable to have a span of no more than 6 meters, since the beams are up to 6 meters in size). The width of the foundation can be 370 mm. The volume of concrete is equal to: perimeter (10 + 9.7) x 2 x 1.2 x 0.37 = 17.5 m3 plus internal load-bearing wall 9 x 1.2 x 0.35 = 3.78 Total 17.5 + 4 = 21.5 m3 For calculation, we take 22 m3 , because There may be errors on the ground + compaction with a vibrator. The loads are small, so you can use concrete M-150 on granite 20-40 mm. The foundation must be reinforced in 4 rods with A500C reinforcement with a diameter of 12 mm. The foundation requires 350 meters of reinforcement. Reinforcement must be carried out in accordance with GOST, taking into account an overlap at the joints of at least 500 mm, reinforced corners and a protective layer of concrete. Compaction with a vibrator is a must. Our company is ready to complete this foundation material + work for 5 thousand x 22 m3 = 110 thousand rubles.

    Base cost

    The height of the base depends on the slope. At the lowest point, it is recommended to perform at least 500 mm. If the slope is very strong, you can achieve a minimum height of 350-400 mm. In the example, we calculate the average height of the plinth 800 mm, of which 200 mm for leveling with red brick and 600 mm for three rows of the block.

    Red brick 47 m (perimeter) x 0.2 x 0.38 = 3.6 m3 x per 400 pieces (quantity in 1 m3) = 1440 pieces. the cost of a brick is 12 rubles + work 9 rubles = 21 rubles x 1440 = 30240 rubles

    Block on crushed stone 390x190x190 M-75 47 (perimeter) x 0.6 x 0.39 = 11 m3 x 64 (quantity in 1 mz) = 704 pieces cost of the block 35 rubles + work 30 rubles = 65 rubles x 704 pieces = 45,760 rubles

    Cement, sand, mesh, water cement 30 mesh x260=7800, sand 5000 rubles, masonry mesh 2x0.38m mesh 10x10 thickness 3mm 50pcs x 40 rubles = 2000 rubles, water 1000 rubles.

    Taking into account delivery and other expenses, the cost of the plinth is material + labor 92 thousand rubles.

    Basement insulation and backfilling

    The base insulation unit can be viewed in the article "". If you want the house to be warm, then insulating the basement is a must. 30% of heat loss occurs through the cold base. To save money, you can use 50 mm foam. The work on insulation and waterproofing will be: 36 m2 x 150 rubles = 5400 rubles. The cost of polystyrene foam is 36 * 0.05 = 1.8 m3 x 2300 = 4140 rubles. As waterproofing, you can use isospan D -1300 rubles. Fastenings 500 rub. If you do not have a central sewer system, then soil for backfilling can be used from a cesspool. Excavator work + manual leveling will cost 5,000 rubles. Thus, the cost of insulation and backfilling, subject to the availability of soil, will cost 18 thousand rubles, if you need to buy soil, then another 3x2500 = 7.5 thousand rubles.

    Walls

    In this article, we will consider two types of walls: from an expanded clay concrete block 190 mm wide and a gas silicate block 290 mm wide, manufactured in Stary Oskol, and then we will consider various options for wall cladding and calculate their cost.

    1. Wall made of expanded clay concrete block 190 mm wide. This wall has sufficient compressive strength, but has weak spatial rigidity. In order for the house to be strong, it is necessary to make a monolithic belt on top of the wall; it can also serve as lintels for windows (with this technique we kill two birds with one stone). Another advantage of this option is that lintels with a width of 190 mm are not produced. “Folk craftsmen” lay the 120x220 lintel flat, so that it hangs on both sides. This cannot be done because the working tensile reinforcement is located at the bottom of the lintel and in any other position it does not work and may break. Another option is to use a metal corner as jumpers. This option is acceptable and will be cheaper, but it is inferior to a monolithic belt in many respects: a monolithic belt is much stronger; the corner rusts over time and this can be seen on the wallpaper through the plaster, etc.

    The number of expanded clay concrete blocks for this house is, taking into account the monolithic belt, 1260 pieces and 1.5 m3 of expanded clay concrete per belt. The cost of erecting walls is 1260 pcs x (35 rubles work + 45 rubles c/w block) = 100800 rubles. Construction of the belt work 40 rm x 800 rubles = 32000 rubles concrete 2x4000 = 8000 rubles, reinforcement 12 mm A500S 250 rm x 30 rubles = 7500 rubles . Thus, the cost of erecting walls, taking into account deliveries, unloading, and other work, is 170 thousand rubles. )

    2. Wall made of gas silicate block 290mm wide. This type of wall is warmer than the first option and when facing walls, 50 mm of insulation is sufficient. This project requires 600 blocks (22.3 m3) with dimensions of 200x290x600 mm and 2.7 m3 of concrete, if the lintels are made in the form of a monolithic belt, if the lintels are made using a metal corner, 680 (25 m3) blocks are required. The cost of 1 m3 of masonry is 2800 material + 1500 rubles labor = 4300 rubles per 1 m2. For a house you need 22.3 m3 x 4300 = 96 thousand rubles (option with a belt) and 25 m3 x 4300 = 107,500 rubles (option without a monolithic belt). In this option, the belt is 240 mm wide and 300 mm high, the remaining 50 mm must be filled with insulation. Thus, the cost of erecting walls, taking into account deliveries, unloading, and other work, is 190 thousand rubles.(The calculation takes into account only external and load-bearing walls, partitions are not included in the calculation)

    Partitions

    Partitions can be made from expanded clay concrete block, measuring 390x190x120 mm. The number of blocks for partitions is 580 pieces. Construction cost 580 pcs x (26 rubles block price + 25 rubles labor) = 30 thousand rubles, under the partitions it is necessary to make a foundation. How to make the foundation for partitions, see the article. The cost of a foundation for partitions made in the form of beams is 35 thousand rubles. Another option for making partitions is plasterboard on a metal frame, in this case there is no need to make a foundation for the partitions and they can be done at any time, after installing the roof and installing windows, partitions from blocks can also be made at any time, the only point is this supplying blocks, if there is a roof, then they can only be supplied manually; this is a little more expensive than installation with a crane or manipulator.

    Ceiling and roof

    A board with a section of 200x50 mm is used as floor beams, laid in increments of 750 mm. In total, it will take 20 pieces to cover, which is 1.2 m3 x 7500 = 9000 rubles, we lay it on top with a half-edged board 25 mm thick x 80 m2 = 2 m3 x 6000 = 12000 rubles. The work is 80 m2 x 200 rubles = 16,000 rubles. For the roof you need 2.5 m3 of timber 50x150 mm and 3 m3 of edged boards, which is 5.5 m3 x 7500 rubles = 41250 rubles. For the roof you need 100 sheets of slate x 180 rubles = 18,000 rubles. Roof installation work 125 m2x450 rubles = 56,250 rubles. The roof and subfloor will be, taking into account all additional costs will be 160 thousand rubles. The lining and drainage system are not taken into account because it is performed after facing the facade.

    Summarize

    The cost of the box and roof without facade cladding and lining with drainage system was: 110+92+18+170+160=550 thousand rubles. If you make a bored foundation, you can do it for 500 thousand rubles or less. If the base is made with a thickness of 190 mm, then you can save another 35-40 thousand (an option for cladding walls with curtain facades: siding, facade panels, etc.). If you do it even cheaper, you will have to deviate from the requirements that we set at the beginning of the article for this house.

    Wall covering

    The area of ​​the external walls of this project is: 35 m2 base and 105 m2 walls. Facade cladding can be made of the following materials:

    1. Vinyl siding. The cost of 1 m2 is 200 rubles per 1 m2. The cost of installation + insulation is from 400 rubles. for 1 m2. You can get acquainted with this material in detail on the website of the company "Alta-profile", there is also a calculator for calculating the material on the website, enter the data of the material you have chosen and get the required quantity and configuration of the material. From practice I will say that 1 m2 of cladding costs 1000 rubles. Thus, wall cladding material + work + insulation will be 105 * 1000 = 105 thousand rubles.

    2. Facade panels. Facade panels in Belgorod are produced by the company "Stofdom"; the cost of 1 m2 of material is 500 rubles per 1 m2, the cost of work is 500 rubles per 1 m2, the cost of material + work + insulation is 1450 rubles. The cost of cladding the walls of the house will be 105 m2 x 1450 rubles = 152 thousand rubles.

    3. Basement siding and facade panels. This material is much better in quality, but the cost of material + labor is 1600 rubles per 1 m2. The cost of wall cladding is 105 m2 x 1600 rubles = 168 thousand rubles. Manufacturer: "Alta-profile", "Doke", etc.

    4. Facing brick. In my opinion, the optimal solution for façade cladding is facing bricks. Its price ranges from 1,700 rubles per 1 m2, but it has a number of advantages over siding and facade panels. You can use brick from the manufacturer Stroitel. Its price is 15.5 rubles for one and a half red facing brick. In 1 m2 of masonry there are 40 bricks x (15.5 brick +20 work) = 1420 rubles, if you add insulation and cement, the price will be 1700 rubles per 1 m2. The cost of facing a house 105 m2 x 1700 rubles = 178 thousand rubles. You should take into account the metal corner as jumpers.

    There are other options for facade cladding, such as marble plaster, bark beetle, but in our example they are not entirely rational.

    Let's summarize

    A house can be built for 600 thousand, but in this case you will have to use drilled foundations and use vinyl siding on the facade. The warranty for this house will be no more than 1 year, because... the material from which it is made may lose its properties after a year, and subsidence cracks are also possible over time (if you perform a full soil analysis and all the necessary calculations, the cost will also increase).

    Our company is ready to offer to build this house for 1 million 300 thousand rubles(without finishing). A strip foundation, facing bricks, metal roofing will be made and all high-quality materials will be used, for which we confidently give a 5-year guarantee, which is stated in the contract. The price includes taxes and you can always take advantage of tax deductions, which will be 1300000*0.13= 169 thousand rubles, which you agree is quite a lot.

    I shared all the secrets of an inexpensive house, but if low-level craftsmen build it, they may make critical mistakes, because... In terms of strength, the construct is used, as they say, “to the limit” and mistakes simply cannot be made. For questions about ordering construction, you can call: +79038877318 and +7-915-568-2915, or write a letter to: [email protected]

    If you have used these materials, tell other visitors about your experience, it will be very useful. If you are interested in additional information, be sure to write in the comments and call, I will definitely share. Share with your friends using the social buttons located at the bottom of the article.

    Best regards, Evgeniy.

    All country cottages are divided into two price groups. Houses up to 500 thousand rubles and luxury buildings costing from half a million rubles. About 70% of all proposed houses belong to the first group. Building such a dacha is much easier than buying a one-room apartment in the city.

    What is a house up to 500 thousand rubles?

    When planning to buy a cottage for half a million rubles, you need to get rid of all illusions. You need to clearly understand that this is a budget building. It will not be usable throughout the year. But from May to October it will be a wonderful home for all family members.

    At the same time, such a building is not a blank or a semi-finished product. It is quite suitable for living without further expenses. Even turnkey finishing will not require excessive financial investments. Such a service will add no more than 25-30% to the total cost, but will save you from a lot of problems.

    The layout of such buildings is developed taking into account the small size of the rooms. In terms of internal layout, such buildings do not differ from their more expensive analogues. Living in them is also comfortable.

    However, the devil is in the details. Affordable country house designs are created from inexpensive timber (often naturally dried), they do not require insulation materials, and simple finishing materials are used.

    You should not think that such a building will be an outright miserable house that you will be ashamed to enter. This is a very good cottage that is easy and inexpensive to maintain throughout the year.

    What is included in the price of a budget cottage?

    The cottage includes:

    • House kit according to the selected project.
    • Pouring the foundation.
    • Installation of communications inside the house.
    • External and internal finishing.

    Frame houses are simple; they are easily and quickly assembled on any type of terrain. If necessary, it is easy to rearrange them or even disassemble them before transporting them to a new location.

    Builders involved in the construction of such houses assemble kits without the use of construction equipment. The work takes a matter of days, about a month is spent on finishing work.

    Next you will find the story of the construction of one house from an ordinary family. A modest and very limited budget did not stop them from achieving their dream of owning their own private home. What came of it, what difficulties our heroes faced and what solutions they used to reduce the cost of construction, this post will tell you about all this.

    Construction is carried out as funds become available.

    Plot. Weeds, no fences. There is an iron garage and electric. pillar on the border of the site.

    The plot itself cost 400 rubles. Bashkiria district, area 2 km from the city.

    We made a fence, bought pickets for 5 rubles each, crossbars for 30 rubles. Painted the garage, paint (drying oil + bombaluminum) 300 rub.

    The result was a strip foundation, 120 high and 40 wide. Kamaz PGS was purchased for 6.t.r. and about 10 bags of cement.

    Since the purchase of the account, approximately 15 thousand rubles have been spent

    We took out a loan of 40 tr. We bought 10 pallets of aerated concrete blocks, about 36 thousand, and used the leftovers to use glue and cement for mixing

    Masonry work has begun.

    So far 55 thousand rubles have been spent.

    The box is ready. They didn’t lay out the whole thing (the back wall behind the frame will be framed, to make it possible to expand the house and bring it up to the planned 9.5x9.5).

    We bought mother timber for 10t.r.

    Frame back wall.

    I started working with 10 kW electricity. Shield, 3-phase 2 tariff meter, grounding. I assembled it completely myself; the electricians simply attached the sip to the pole.

    It cost 10 thousand rubles.

    So far 75 thousand rubles have been spent.

    We waterproofed the foundation. Friends fitted a used door. We bought OSB tiles for 7 thousand rubles.

    We hired a front loader for excavation work. 2t.r.

    The foundation was sprinkled.

    We started making a temporary roof. We bought bars for 7 rubles. and roofing material 2t.r. For the sheathing for 5 thousand rubles.

    Almost 100 rubles spent. approximately.

    They pulled up wooden windows.

    I am 22, my father is 53 years old. Workers. I get 10, and my father gets 14 rubles. I'm an electrician and he's a mechanic.

    Winter has begun.

    In late autumn they made a well, bought 5 rings for 1,200 rubles, half was dug by the drunks themselves, the rest. Pipes for communications. We bought 6,000 worth of boards for the ceiling and a concrete mixer for 8.00.

    120 tr spent.

    We made a rough ceiling. Then I plan to use plasterboard or tension ones.

    San. node

    Also in April, water supply and sewerage were installed. The concrete screed was poured. We bought 2 pallets of bricks, 10 bags of cement, forest sand. We started making the bathroom.

    Spent since the purchase of the plot, 130 tr.

    Spent some good money the other day:

    Shower cabin, promotion 10,000

    Toilet 3700

    Washbasin with pedestal 2000

    Two lever mixers 800 each

    Sink with legs ala “village” for a temporary kitchen 1500

    EPS 7 sheets for 750 rub.

    Polypropylene pipes 600 rub.

    5 bags of cement 850 RUR

    Soldering iron rental 200

    Total spent since purchase 158,000 rubles

    Civilization is slowly coming.

    We bought a storage water heater for 9,000. And a pumping station, according to the promotion, cost 3,800 rubles.

    My work place.

    General form.

    Garden. In the garden, cabbage, potatoes, raspberries, currants, grapes, corn, beets, apple trees, sloe, carrots, mint, onions, parsley, cherries and more.

    And now the expansion of the house. Living in the built part is quite comfortable.

    I drew a sketch of the future expansion.

    The expansion will be carried out using TISE technology

    Video shows TISE technology

    5 cylinders of polyurethane foam 1300

    Foam gun 500

    Chinese metal door 3000

    Electric convector 2kW 2000

    Apple and Plum seedling 1200

    It's +7 outside, raining. I set the convector at 18* during the day and 22* at night because... two-tariff meter. I paid for electricity and it turned out to be 1,100 rubles for two months.

    On our street a plot with a foundation is for sale for 900 tr. So my farm is already easily 1.2 mults

    As I wanted: Lay EPPS, Folgoizolon, TP pipes, Buy two batteries of 10 sections, an electric boiler and later a wood-burning boiler.

    It turned out: the ceiling is insulated with foil insulation and 10 cm of polystyrene foam, there is a laminate underlay on the floor) 1 convector, you will need to take a second one. I think I’ll spend the winter like this, but people in SIP houses live with convectors. So it goes…

    Bought: RUR 12,000 Wood stove

    250 Polyurethane foam

    200 Mailbox

    Approximate expenses each month:

    Gasoline 1000

    Elvo, internet, phone numbers 1200

    Credit (2 months left) 3000

    Food and household goods: 5,000 approximately.

    And 8–10 are left for construction every month. Normal

    The stove is cooking, it's +1 outside. at home 20+ While I’m burning pallets and other waste.

    This month I plan to take slabs and a Makita electric chain saw. I also owe 10,000 on my credit card for EPP and PPP.

    Our finished timber houses are sold from 1 million (farther from the city) with plots. In general, if a business sells such a house, then its profit is at least 500 kopecks. The work is very expensive, so if you do everything yourself, it turns out to be very affordable.

    I bought a washing machine for 10,000 and an LCD TV for 9,000 rubles. EVERYTHING IS LIKE PEOPLE.

    In total, since the beginning of construction, approximately 250,000 rubles have been spent. (Including car and TV.)

    In February I will probably connect IPTV and ADSL Internet.

    Meanwhile, gas was installed outside. If it works out, I’ll take out a loan in the fall and start it.

    They also promise water in the spring. The cadastral value of the plot is already 850 thousand rubles - a good investment, an increase of 200%

    The average electricity bill is 1,100 rubles per month, with a price of 2.40 per kW during the day and 1.40 at night.

    Over the entire winter, two Gazelle slabs were purchased for firewood at 1,500 rubles each.

    The temperature in the house remains 23*C, despite the three-meter ceilings. Aerated concrete retains heat well.

    You can evaluate the future scope of work.

    Approximate plan until autumn:

    Finish the foundation

    Build the second half using TISE-2 technology

    Make a new big roof

    Register a house

    "Register"

    Get a tax deduction

    Connect the gas, make gas heating.

    Quit and find a new job.

    If I suddenly get rich, I'll build a foundation for a garage.

    Stone fence.

    Once again I refused my vacation and received compensation for unused vacation pay of 12 thousand. Lol.

    Kamaz PGS, 5000 rub.

    Submersible, vibration pump, + hose - 1600

    12 bags of cement, 3200 rub.

    total: 10.000

    So far, about 260 thousand have been spent.

    Today I poured a meter of foundation.

    Today we finished the main foundation, there are 2 bags of cement left. Tomorrow they will start pouring the foundation under the veranda.

    The layout of the extended house needs to accommodate 3 small bedrooms, a staircase entrance and one bathroom.

    The "height" should not be too high. 5 meters, for example, is clearly a lot. But at the same time, you need to find a balance so that the usable area is sufficient for the rooms.

    It will be a big plus if you don’t have to dismantle the old rafters and build them in somehow.

    I chose the cheapest version of the TISE machine. The machine costs 30 thousand, and the TISE walls will cost me the same amount.

    6 rows have been laid out, 14 remain. The cement and cement are slowly running out.

    Fence and area.

    About 260 thousand is all the money invested, I don’t know how much is left, in principle it doesn’t matter, it’s done for yourself.

    Who wants to look for plots of land on Avito and in local newspapers, of course, you can also through realtors, they sometimes buy in bulk, then cut into pieces, but I don’t want to feed the system, the main thing is that the land is owned, the type of private housing construction land. And whoever has the opportunity, then come and look and find out on the spot. Accessible all year round and good electricity. This is enough.

    I have an individual housing construction type of land, owned land. (No building permit is needed, neither is the project)

    So, report. We got a little pissed off and bought another 25 bags of cement and 6 cubic meters of sand using a credit card for 5,000. Corners for the lintels cost 1,000 rubles.

    2 KamAZ PGS trucks were purchased, half of the first batch went to the foundation, half of the second batch remained (will go to the floors)

    It turns out that 1 KAMAZ was used up, (6 cubic meters) clean 5000 rubles

    55 bags of cement, delivery RUR 13,500

    Masonry mesh 500 RUR

    Ruberoid 300r

    Total 20,000 rubles. Excellent result!

    The walls are finished. They frothed. We started plastering and whitewashing.

    Polyurethane foam 500 rub.

    Lumber for the roof, delivery RUB 18,300:

    Edged boards 18x5x600 23 pcs (rafters, mats)

    Bars 10x5x600 7 pcs (uterus)

    Edged boards, 2nd grade 2x10x600 1cube (sheathing)

    And the only money left is for food...

    Meanwhile, rennet is mutating.

    On Saturday we called relatives, dismantled part of the roof and installed 3 rafters, we plan to install the rest next Saturday.

    Costs: 500 rubles for screws and nails

    Also today I ordered corrugated sheeting, 156 sq.m., 10 meters of skates, 750 screws, 140 sq. meters of membrane for a cosmic sum of 42 thousand rubles for me.

    Paid by Sberbank credit card.

    We bought a screwdriver for 1700 rubles

    Hardware products: staples, nails, screws 500 rub.

    According to an approximate calculation, funds in the amount of 345,000 rubles have been spent so far. A lot of money.

    Meanwhile, roofing work began.

    There weren't enough boards for sheathing on the other side. We can purchase additional items in advance.

    We have 2 km or 20 minutes walk to the city. 10 minutes on the bike.

    There is a bus.

    This is how we get to work: we get up at 6.20.

    At 6.50 we drive to the city by car (my father and I have the same schedule).

    At 7.00 the working livestock truck leaves for the plant, at 7.45 the shift starts.

    The shift ends at 16.20, at 16.50 the livestock truck takes us to the city (15 minutes drive). We get into the car and go home, at 17.30 we are already there.

    If you drive straight to work, you’ll be home by 4:50 p.m., but this is an expensive proposition.

    We don't have a project. Wiring is different. The bathroom is hidden, there are already all sockets there on a permanent basis. The rest of the cables are currently lying along the wall; in the future they will be packed in corrugation and remain under the drywall.

    Ventilation will be built into the false ceiling.

    I bought a cherry seedling “Bessey” for 500 rubles

    The roof was almost finished, and along the way it turned out that there were not enough skates. Money is tight for now.

    Two cans of foam and a new gun 1000 RUR

    3 bags of cement and paint 1000 RUR

    Total: 3000

    We installed old wooden windows and doors and hand-tinted the paint.

    We started pouring the floors.

    We are slowly paying off our credit card debt, we have 24 thousand left.

    It took 7 bags of cement for 1800 rubles to fill the floors

    Paint and brush for windows total 2000 rub.

    Today we bought 6 meters of d114 pipe for the chimney. 2350 rub. Cheap galvanized steel burned through.

    Tomorrow I will cook and start plastering inside.

    Since birth, I lived in an apartment for 22 years, now you can’t force me back there with a stick. Although if I sell the house, I’ll have enough for 3 units in a new building.

    There is freedom and silence here. More space for recreation, for example you can buy a motorcycle or a motor boat. The garden is at your fingertips.

    In the meantime, we finished the roof - we bought additional skates for 2000 rubles, cement for 600 rubles. We are plastering the back wall.

    A lot of other small work was also done. Covered apple and plum trees in case of severe frosts and so on.

    Short list of construction solutions from 200k:

    Try to do everything yourself. It's not difficult, fortunately there is the Internet. The margin for work in finished houses is up to 300%.

    Choose the right land - Owned, the type of land is preferably individual housing construction. Road and electricity are the main thing. The rest will follow.

    Cheap foundation: TISE, MZFL

    If you don’t know what material to build from, choose concrete - a classic. Kindergartens, hospitals, houses - basically everything is concrete.

    Always insulate from the outside (dew point) Read: “Wet façade” insulation technology.

    Don’t get carried away by “modern solutions” from “advisers”. Foundations cost 500 thousand rubles, and other excesses in theoretical calculations make the price of construction astronomical. Pay attention to old houses.

    Construction is carried out as funds become available.

    Plot. Weeds, no fences. There is an iron garage and electric. pillar on the border of the site. The plot itself cost 400 thousand rubles. Bashkiria district, area 2 km from the city.

    We made a fence, bought pickets for 5 rubles. pcs., crossbars 30 rub. Painted the garage, paint (drying oil + bombaluminium) 300 rubles.

    The result was a strip foundation, 120 high and 40 wide. Kamaz PGS was purchased for 6 thousand rubles. and about 10 bags of cement. Since purchasing the account, approximately 15 thousand rubles have been spent.

    We took out a loan of 40 thousand rubles. We bought 10 pallets of aerated concrete blocks, about 36 thousand, and used the leftovers to use glue and cement for mixing.

    Masonry work has begun. So far 55 thousand rubles have been spent.

    The box is ready. They didn’t lay out the whole thing (the back wall behind the frame will be framed, to make it possible to expand the house and bring it up to the planned 9.5x9.5).

    We bought mother lumber for 10 thousand rubles.

    Frame back wall.

    I started working with 10 kW electricity. Shield, 3-phase 2 tariff meter, grounding. I assembled it completely myself; the electricians simply attached the sip to the pole.

    It cost 10 thousand rubles. So far 75 thousand rubles have been spent.

    We waterproofed the foundation. Friends fitted a used door. We bought OSB tiles for 7 thousand rubles.

    We hired a front loader for excavation work. 2 thousand rubles

    The foundation was sprinkled.

    We started making a temporary roof. We bought bars for 7 rubles. and roofing material 2 thousand rubles. Croakers for sheathing for 5 thousand rubles. Almost 100 rubles spent. approximately.

    They pulled up wooden windows. I'm around 22, my dad is 53 years old. Workers. I get 10, and my father gets 14 thousand rubles. I am an electrician, and he is a mechanic.

    Winter has begun. In late autumn they made a well, bought 5 rings for 1,200 rubles, half was dug by the drunks themselves, the rest. Pipes for communications. We bought 6,000 worth of boards for the ceiling and a concrete mixer for 8.00.

    120 thousand rubles spent.

    We made a rough ceiling. Then I plan to use plasterboard or tension ones.

    San. node Also in April, water supply and sewerage were installed. The concrete screed was poured. We bought 2 pallets of bricks, 10 bags of cement, forest sand. We started making the bathroom.

    Spent since the purchase of the plot, 130 thousand rubles.

    Spent some good money the other day:

    Shower cabin, promotion 10,000
    Toilet 3700
    Washbasin with pedestal 2000
    Two lever mixers 800 each
    Sink with legs ala “village” for a temporary kitchen 1500
    EPS 7 sheets for 750 rub.
    Polypropylene pipes 600 rub.
    5 bags of cement 850 RUR
    Soldering iron rental 200 Total spent since purchase 158,000 rubles.

    Civilization is slowly coming. We bought a picrelated Ariston storage water heater for 9,000. And a pumping station, according to the promotion, cost 3,800 rubles.

    The most important.

    General form.

    Garden. In the garden, cabbage, potatoes, raspberries, currants, grapes, corn, beets, apple trees, sloe, carrots, mint, onions, parsley, cherries and more. And now the expansion of the house. Living in the built part is quite comfortable.

    I drew a sketch of the future expansion.

    The expansion will be carried out using TIS technology.

    They dragged the pillows under the foundation. We made a 2-meter formwork and poured 4 batches with the remains of cement. The beginning of the second part of the construction of NICHEBROD INC. CORP. it's supposed to. We are expecting a salary in July for cement. They also filled in something like a septic tank.

    TISE and the site.

    The window was installed the other day, pictorialized. We poured 9 meters of the foundation, there are still 9 left, but this year I don’t know if it will work. Window sill 300 rubles, two cylinders of foam 200 each. Roll of foil insulation 50 sq. m. 1300 rub. One of these days I’ll buy Kamaz clay for 2500. Our Internet connection is fine, I’ve just downloaded the first season of Dexter.

    I’ll write a shopping list before I forget:

    Polystyrene foam PSB-15 10 cm - 51 sq.m.
    EPPS 5cm – 21 tiles 10.500
    Underlay for laminate 50 m. 800
    5 cylinders of polyurethane foam 1300
    Foam gun 500
    Chinese metal door 3000
    Electric convector 2kW 2000
    Apple and Plum seedling 1200 It’s +7 outside, raining. I set the convector at 18* during the day and 22* at night because... two-tariff meter. I paid for electricity and it turned out to be 1100 rubles for two months.
    On our street a plot with a foundation is for sale for 900 tr. So my farm is already easily 1.2 mults

    As I wanted: Lay EPPS, Folgoizolon, TP pipes, Buy two batteries of 10 sections, an electric boiler and later a wood-burning boiler.

    It turned out: the ceiling is insulated with foil insulation and 10 cm of polystyrene foam, there is a laminate underlay on the floor) 1 convector, you will need to take a second one. I think I’ll spend the winter like this, but people in SIP houses live with convectors. So it goes...

    Bought: RUR 12,000 Wood-burning stove Teplodar TOP200
    +250 Polyurethane foam
    +200 Mailbox Approximate expenses each month:
    Gasoline 1000
    Elvo, internet, phone numbers 1200
    Credit (2 months left) 3000
    Food and household goods: 5,000 approximately.
    And 8-10 are left for construction every month. Normal

    The stove is cooking, it's +1 outside. at home 20+ While I’m burning pallets and rubles. waste.

    This month I plan to take slabs and a Makita electric chain saw. I also owe 10,000 on my credit card for EPP and PPP.

    The main thing is to start. You never know what you can do till you try. Our finished timber houses are sold from 1 million (farther from the city) with plots. In general, if a business sells such a house, then its profit is at least 500 kopecks. The work is very expensive, so if you do everything yourself, it turns out to be very affordable. I bought a washing machine for 10,000 and an LCD TV for 9,000 rubles. EVERYTHING IS LIKE PEOPLE. In total, since the beginning of construction, approximately 250,000 rubles have been spent. (Including a typewriter and TV.) In February I will probably connect IPTV and ADSL Internet. Meanwhile, gas was installed outside. If it works out, I’ll take out a loan in the fall and start it. They also promise water in the spring. The cadastral value of the site is already 850 thousand rubles - a good investment, an increase of 200%. The average electricity bill is 1100 rubles per month, with a price of 2.40 per kW during the day and 1.40 at night. Over the entire winter, two Gazelle slabs were purchased for firewood at 1,500 rubles each. The temperature in the house remains 23*C, despite the three-meter ceilings. Aerated concrete retains heat well. So it goes. Here.

    You can evaluate the future scope of work. Approximate plan until autumn:
    Finish the foundation
    Build the second half using TISE-2 technology
    Make a new big roof
    Register a house
    "Register"
    Get a tax deduction
    Connect the gas, make gas heating.
    Quit and find a new job.
    If I suddenly get rich, I'll build a foundation for a garage.
    Stone fence.

    Once again I refused my vacation and received compensation for unused vacation pay of 12 thousand. Lol. Purchased:
    Kamaz PGS, 5000 rub.
    Submersible, vibration pump, + hose - 1600
    12 bags of cement, 3200 rub.
    total: 10.000
    So far, about 260 thousand have been spent.
    Today I poured a meter of foundation.

    Today we finished the main foundation, there are 2 bags of cement left. Tomorrow they will start pouring the foundation under the veranda.

    The layout of the extended house needs to accommodate 3 small bedrooms, a staircase entrance and one bathroom.
    The "height" should not be too high. 5 meters, for example, is clearly a lot. But at the same time, you need to find a balance so that the usable area is sufficient for the rooms.
    It will be a big plus if you don’t have to dismantle the old rafters and build them in somehow.

    I chose the cheapest version of the TISE machine. The machine costs 30 thousand, and the TISE walls will cost me the same amount.

    6 rows have been laid out, 14 remain. The cement and cement are slowly running out.

    Fence and area.

    About 260 thousand is all the money invested, I don’t know how much is left, in principle it doesn’t matter, it’s done for yourself.

    Who wants to look for plots of land on Avito and in local newspapers, of course, you can also through realtors, they sometimes buy in bulk, then cut into pieces, but I don’t want to feed the system, the main thing is that the land is owned, the type of private housing construction land. And whoever has the opportunity, then come and look and find out on the spot. Accessible all year round and good electricity. This is enough.

    I have an individual housing construction type of land, owned land. (No building permit is needed, neither is the project) So, the report. We got a little pissed off and bought another 25 bags of cement and 6 cubic meters of sand using a credit card for 5,000. Corners for the lintels cost 1,000 rubles. Now you can calculate approximately how much (20 blocks left to fill) the walls cost: 2 KamAZ ASG trucks were purchased, half of the first batch went to the foundation, half of the second batch remained (will go to the floors).

    It turns out that 1 KAMAZ was used up, (6 cubic meters) clean 5000 rubles
    55 bags of cement, delivery RUR 13,500
    Masonry mesh 500 RUR
    Ruberoid 300r
    Total 20,000 rubles.

    Excellent result!

    The walls are finished. They frothed. We started plastering and whitewashing.
    Polyurethane foam 500 rub.
    Lumber for the roof, delivery RUB 18,300:
    Edged boards 18x5x600 23 pcs (rafters, mats)
    Bars 10x5x600 7 pcs (uterus)
    Edged boards, 2nd grade 2x10x600 1cube (sheathing)
    And the only money left is for food...

    Meanwhile, rennet is mutating.

    On Saturday we called relatives, dismantled part of the roof and installed 3 rafters, we plan to install the rest next Saturday.
    Costs: 500 rubles for screws and nails. Also today I ordered corrugated sheeting, 156 sq.m., 10 meters of skates, 750 screws, 140 sq. meters of membrane for a cosmic sum of 42 thousand rubles for me. Paid by Sberbank credit card. So it goes...

    We bought a Hammer screwdriver for 1,700 rubles.

    Hardware products: staples, nails, screws 500 rub.

    According to an approximate calculation, funds in the amount of 345,000 rubles have been spent so far. A lot of money.

    Meanwhile, roofing work began.

    There weren't enough boards for sheathing on the other side. We can purchase additional items in advance. We have 2 km or 20 minutes walk to the city. 10 minutes on the bike.
    There is a bus.

    This is how we get to work: we get up at 6.20.

    At 6.50 we drive to the city by car (my father and I have the same schedule).

    At 7.00 the working livestock truck leaves for the plant, the shift starts at 7.45.

    The shift ends at 16.20, at 16.50 the livestock truck takes us to the city (15 minutes drive). We get into the car and go home, at 17.30 we are already there. If you drive straight to work, you’ll be home by 4:50 p.m., but this is an expensive proposition.

    We don't have a project. Wiring is different. The bathroom is hidden, there are already all sockets there on a permanent basis. The rest of the cables are currently lying along the wall; in the future they will be packed in corrugation and remain under the drywall. Ventilation will be built into the false ceiling.
    I bought a cherry seedling "Bessey" for 500 rubles.

    The roof was almost finished, and along the way it turned out that there were not enough skates. Money is tight for now.

    Two used 3x6 advertising banners for the gables 1000 RUR Two cans of foam and a new gun 1000 RUR 3 bags of cement and paint 1000 RUR Total: 3000 We installed old wooden windows and doors, tinted the paint by hand. We started pouring the floors. We are slowly paying off our credit card debt, we have 24 thousand left.

    It took 7 bags of cement worth 1,800 rubles to fill the floors.
    + paint and brush for windows total 2000 rub.

    Today we bought 6 meters of d114 pipe for the chimney. 2350 rub. Cheap galvanized steel burned through.

    Tomorrow I will cook and start plastering inside.

    Since birth, I lived in an apartment for 22 years, now you can’t force me back there with a stick. Although if I sell the house I will have enough for 3 units in a new building. There is freedom and silence here. More space for recreation, for example you can buy a motorcycle or a motor boat. The garden is at your fingertips. In the meantime, we finished the roof - we bought additional skates for 2000 rubles, cement for 600 rubles. We are plastering the back wall. A lot of other small work was also done. Covered apple and plum trees in case of severe frosts and so on.

    Make up your mind. The last word to adequate people: Thank you to those who supported, 2 years flew by unnoticed.

    All in your hands. The idea was to help people who want to deprive themselves of the housing problem with their own hands but did not dare. Make up your mind. Don't feed the system with mortgages.

    Short list of construction solutions from 200k-poson:

    Try to do everything yourself. It's not difficult, fortunately there is the Internet. The margin for work in finished houses is up to 300%. Choose the right land - Owned, the type of land is preferably individual housing construction. Road and electricity are the main thing. The rest will follow. Cheap foundation: TISE, MZFL If you don’t know what material to build from, choose concrete - a classic. Kindergartens, hospitals, houses - basically everything is concrete.

    Always insulate from the outside (dew point) Read: “Wet façade” insulation technology.

    Don't get carried away by "modern solutions" from "advisers". Foundations cost 500 thousand rubles, and other excesses in theoretical calculations make the price of construction astronomical. Pay attention to old houses.

    Download:

    People even with a low income can become the owner of country real estate in the Nizhny Novgorod region. Our catalog of standard projects presents frame houses up to 500 thousand rubles for self-construction on a summer cottage. Ready-made house kits made from SIP panels have an affordable price, so anyone can buy a dacha for five hundred thousand and build it in 1-2 weeks on their own plot of land. There is a misconception that a low price is due to the use of poor building materials, but this is not true! SIP panels are a modern material widely used in low-rise construction. Due to their low cost, durability and reliability, frame houses made from SIP panels are popular among connoisseurs of country holidays. The Basco company website presents more than 10 standard projects with excellent design and thoughtful layout.

    Ready-made house projects up to 500 thousand rubles

    Having a small amount of 500 thousand rubles on hand, you can build a turnkey house using high-quality building materials and fittings. This became possible thanks to the improvement of building materials. The gradual reduction in the cost of house kits has led to the fact that anyone can purchase or order the construction of a frame house for 500 thousand. The layout and appearance of the cottage is determined at the project selection stage, after which a house kit for self-assembly is produced in production. There are plenty of options for future housing - there are options for country real estate with a garage, attic, with a summer terrace or veranda. How to build a house is up to you to decide. The goal of our company is to simplify this process and make housing accessible to all residents of the Nizhny Novgorod region.

    Turnkey construction of houses up to 500 thousand rubles

    When buying a two-story house for 500 thousand, you are preparing for disappointment, but in vain. Modern standard designs of houses made from SIP panels compare favorably with similar buildings made from other materials. The main advantages of frame technology:

    • Low price of a ready-made house kit
    • Possibility of self-construction
    • Manufacturer's warranty "BASKO"
    • Good layout that takes into account the interests of each family member
    • Durability, reliability

    The BASKO company sells mansions and cottages worth up to 500 thousand rubles. This amount includes: a set of SIP panels and interfloor ceilings, detailed instructions for self-assembly, fasteners.